1. Which of the following is not a major task of Exit criteria?

Correct! Wrong!

2. Testing where in we subject the target of the test , to varying workloads to measure and evaluate the performance behaviors and ability of the target and of the test to continue to function properly under these different workloads

Correct! Wrong!

3. Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated components is

Correct! Wrong!

4. Static analysis is best described as:

Correct! Wrong!

5. One of the fields on a form contains a text box which accepts alpha numeric values. Identify the Valid Equivalence class

Correct! Wrong!

6. Reviewing the test Basis is a part of which phase

Correct! Wrong!

7. Reporting Discrepancies as incidents is a part of which phase

Correct! Wrong!

8. Which of the following items would not come under Configuration Management?

Correct! Wrong!

9. Handover of Test-ware is a part of which Phase

Correct! Wrong!

10. The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 21. Identify the Equivalence values which belong to the same class

Correct! Wrong!

11. The approach/document used to make sure all the requirements are covered when writing test cases

Correct! Wrong!

12. Executing the same test case by giving the number of inputs on same build called as

Correct! Wrong!

13. Control Charts is a statistical technique to assess, monitor, and maintain the stability of a process

Correct! Wrong!

14. To check whether we are developing the right product according to the customer requirements are not. It is a static process

Correct! Wrong!

15. To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process

Correct! Wrong!

16. Staff development plan describes how the skills and experience of the project team members will be developed.

Correct! Wrong!

17. It is a set of levels that defines a testing maturity hierarchy

Correct! Wrong!

18. A Non-Functional Software testing done to check if the user interface is easy to use and understand

Correct! Wrong!

19. The review and approved document (i.e. Test plan, System Requirement Specification’s) is called as

Correct! Wrong!

20. What are the Testing Levels?

Correct! Wrong!

21. Cost of quality = Prevention Cost + Appraisal cost + Failure cost

Correct! Wrong!

22. A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also called as “fishbone diagram” what is this?

Correct! Wrong!

23. It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process.

Correct! Wrong!

24. Variance from product specifications is called?

Correct! Wrong!

25. Verification is

Correct! Wrong!

26. White box testing is not called as

Correct! Wrong!

27. Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as

Correct! Wrong!

28. Retesting of a single program or component after a change has been made?

Correct! Wrong!

29. Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC)

Correct! Wrong!

30. The testing which is done by going thro' the code is known as,

Correct! Wrong!

31. Configuration Management Plan describes the Configuration Management procedures and structures to be used.

Correct! Wrong!

32.This type of testing method attempts to find incorrect or missing functions, errors in data structures or external database access, interface errors, Performance errors and initialization and Termination errors. It is called as

Correct! Wrong!

33. Phase Definition. It will come under

Correct! Wrong!

34. Software testing which is done without planning and Documentation is known as

Correct! Wrong!

35. Acceptance testing is known as

Correct! Wrong!

36. Retesting the entire application after a change has been made called as?

Correct! Wrong!

37. Boundary value analysis belongs to which testing method?

Correct! Wrong!

38. It measures the quality of a product It is a specific part of the QA procedure, It is a corrective process, It applies for particular product & Deals with the product.

Correct! Wrong!

39. What are the Types of Integration Testing?

Correct! Wrong!

40. Product Risk affects The quality or performance of the software.

Correct! Wrong!

41. A metric used to measure the characteristic of documentation and code called as

Correct! Wrong!

42. Which is non-functional software testing?

Correct! Wrong!

43. The process that deals with the technical and management issues of software development called as?

Correct! Wrong!

44. Executing the same test case on a modified build called as

Correct! Wrong!

45. Which is Black-Box Testing method?

Correct! Wrong!

46. Business Risk affects The Organization developing or Procuring the software.

Correct! Wrong!

47. Stratification is a Technique used to analyze/divide a universe of data into homogeneous groups(stratA..

Correct! Wrong!

48. Automation Testing should be done before starting Manual testing. Is the above statement correct?

Correct! Wrong!

49. Earlier a defect is found the cheaper it is to fix it. Is the above statement correct?

Correct! Wrong!

50. Informing to the developer which bug to be fix first is called as

Correct! Wrong!

Manual Testing Assessment Part One
Bad!
Need some Improvement!
Not Bad
Good!
Awesome!